For a warehouse, the hazard question is not whether the structure survives. It is what half a metre of water costs when it reaches your stock. Here is how to screen a site.
A concrete warehouse handles half a metre of floodwater fine. The building is still standing the next morning. The stock is not.
That is the whole difference between screening a house and screening a warehouse. For a house, the question is whether the structure and the people are safe. For a warehouse, the structure is rarely the issue and the contents are almost always the issue.
Before you look at any map, work out what water actually costs you.
Now you have a number to weigh a site against, and the hazard screening turns from an abstract rating into a budget line.
The general site-selection version is in picking a site for a shop, warehouse, or clinic.
Loading dock level. A dock designed for truck bed height is often the lowest opening in the building. That is where water enters.
Yard drainage and where it discharges. A big paved yard produces a lot of runoff. If its outlet is a channel that backs up, the yard becomes the retention pond.
Racking base and the bottom pallet. The cheapest flood mitigation in a warehouse is a rule that nothing valuable sits on the floor. Raising the bottom beam changes the loss curve immediately.
Power and control gear. Panels, UPS, chargers, compressors. If they are at floor level, the recovery time after a flood is measured in weeks rather than days.
Access for trucks. The building can be dry while the approach road is impassable. For a distribution operation that is the same outcome as flooding.
Insurers price stock cover on location and on what you do about it. A site in a mapped high susceptibility zone with everything on the floor is a different proposal from the same site with raised racking, elevated panels, and a documented flood plan.
Bring the screening to the conversation. It also belongs in your lease negotiation, because a landlord who knows the site floods should be sharing that risk. See how a hazard profile affects insurance cost.
Most warehouse flood losses are avoidable in the last two hours if somebody has authority to act. The plan needs three things: what tells you to start, who decides, and what gets moved first.
Write it down. Put a copy at the gate. Rehearse it once. This is the cheapest risk reduction in the whole operation, and it is worth more than any single piece of infrastructure.
A hazard screening reports mapped susceptibility, elevation, slope, and distances at a point from public national datasets. It does not survey a building, assess racking, or model the drainage of a specific industrial estate. Those need a licensed structural and civil engineer and a proper site survey.
CheckHazard does not replace a professional geotechnical or engineering survey.